>>> 'dcl' problem from bob -- Wed Jan 10 11:10:45 1990 <<<

There appears to be a steam leak in the HVAC of the dcl 
(Rm 407). I will report this to Eleta. The odor in this 
room is likely caused by the anti scaling compounds used 
in the steam system. It should not be a health problem.

>>> 'dcl' problem from bob -- Tue Jan 16 10:56:27 1990 <<<

Jim Chung has providied a list of priorities of service
for the dcl. These are:

1. Reinstallation of the cold probe (evan)

2. Installation of an air line and rehookup of
   the electroglass (phill)

3. Installation of water and a drain to the hot chuck
   to be done only when ok'd by Jim Chung as the
   tool is under high useage.

These jobs have been prioritized and assigned.

>>> 'dcl' problem from evan -- Wed Jan 17 09:18:01 1990 <<<

The high pressure cylinder of n2 has been reinstalled on the cold probe in
the new location.

>>> 'dcl' problem from phillip -- Wed Feb  7 14:24:18 1990 <<<

Update: The air supply and return lines in rm.409 are almost
complete. The hot chuck H2o installation is also close to
fruition. Both of these should be up by tomorrow noon.

>>> 'dcl' problem from phillip -- Wed Feb  7 14:28:18 1990 <<<

test

>>> 'dcl' problem from phillip -- Thu Feb  8 14:32:37 1990 <<<

The work that was initially requested by Jim Chung is
substantially completed.
 The hot chuck, although plumbed, has yet to be turned on.
CAn Bill Flounders or Jim call me when this is activated?

Jim, please stop by and see me when your schedule permits.

>>> 'dcl' problem from bob -- Fri Mar  9 15:04:35 1990 <<<

A socket needs replacing on one of the Bausch&Lomb Illuminators.
. 

>>> 'dcl' problem from bob -- Wed Mar 14 08:28:39 1990 <<<

An order has been placed through McBain Inst. (1-818-998-2702)
for some new illuminator sockets for the B&L Microscopes. A new
one will be installed in the defective illuminator when it arrives.

>>> 'dcl' problem from bob -- Thu Mar 15 11:19:36 1990 <<<

Replacement sockets for the B&L illuminatos have been ordered.
They will take 6 weeks to get here. All illuminators in the dcl
will be checked and repaired when these parts arrive.

>>> 'dcl' problem from bob -- Wed Mar 21 11:54:56 1990 <<<

Room 407 is exceedingly hot and uncomfortable. A report will be
amde to eleta to have the Stationary Engineer check this room out
and service as needed.

This report will be cc'd to eleta for action.

>>> 'dcl' fix from evan -- Tue May  8 14:38:36 1990 <<<

replaced the lamp socket in the microscope illuminator.
spare sockets are in stock at the microlab office.