>>> 'yag' problem from bob -- Tue Nov 14 16:35:47 1989 <<<

This is a test of yag, a new piece of equipment. It will be a 
quintupled YAG laser installed in gl-4. Even Stateler is the technician
in charge. It arrival is pending.

>>> 'yag' problem from partlo -- Tue Nov 28 09:17:09 1989 <<<

The yag will be arriving on Dec 14.  The only facilities required
are 3 phase power and coolant water.  Bob H. has the specs on
the power and water.

>>> 'yag' problem from partlo -- Wed Nov 29 09:22:24 1989 <<<

The person at Quantel to contact for installation questions
is Brian Nelson (405) 727-3240 ext#332.  He is the head of
their service department. (He probably is the entire service dept.---
small company.)

>>> 'yag' problem from phillip -- Wed Dec  6 06:36:01 1989 <<<

Power has been installed for this machine as per the specs
I was supplied with.
Panel 14LN  - Breaker 22       3phase/208VAC/20amps/4wire
The breaker is currently 'off' and the male plug for the 
machine itself can be found on top of the load center.

>>> 'yag' problem from partlo -- Wed Feb 28 16:22:20 1990 <<<

ITS COMING!!!!! ITS COMING!!!!!!

Yes, believe it or not, the quintupled YAG is on its way!
As we speak the YAG is being shipped here, to arrive next
week.

Almost everything is ready in GL4.  The only services not
installed are the industrial cold water supply and return.

The power supply will go in the midway chase and the laser
will go on the optical table in GL4.  I will have the machine
shop cut a small hole in the wall for the power and control
cables between the laser head and the power supply.

I can hardly believe this thing is coming.

		-WNP

>>> 'yag' problem from partlo -- Wed Mar 28 14:56:05 1990 <<<

The YAG will be intalled on Wed. April 4.  The Industral Cold
Water Supply and Return are not installed yet.  I can't remember
who's job list this was placed on.  I would do it myself, but
that would probable give Bob and Katalin a brain hemerage, considering
the history of the water supply above GL4.

WNP

>>> 'yag' fix from phillip -- Wed Apr 25 09:55:28 1990 <<<

Connected controller to taurus this day and hour.

>>> 'yag' fix from evan -- Wed May  2 14:43:52 1990 <<<

Added solenoid valve to cooling h2o supply line.  This is activated
by the taurus box.