>>> 'n2' problem from liu -- Tue Jan  3 21:29:27 1989 <<<

MBE growth used LN 2". Thanks.       

>>> 'n2' problem from mario -- Fri Jan  6 13:00:08 1989 <<<

filled microlab tank #3.  Tank was empty at start.

>>> 'n2' problem from evan -- Mon Jan  9 14:28:28 1989 <<<

The bulk tank is schrduled to be filled early Wednesday a.m.

>>> 'n2' problem from evan -- Wed Jan 11 09:01:25 1989 <<<

The bulk tank was partially filled from 33" to 82" with 1292 gal.

>>> 'n2' problem from evan -- Wed Jan 11 09:49:25 1989 <<<

27347 is the BATCHtrol reading at this time.

>>> 'n2' problem from jules -- Fri Jan 13 14:24:13 1989 <<<

Filled tank #1. Empty at start. Main tank level 68 at start, 66 at end.

>>> 'n2' problem from jules -- Fri Jan 13 14:25:50 1989 <<<

Filled tank #2. Empty at start. Main tank level 66 at start, 64 at end.

>>> 'n2' problem from dar -- Sun Jan 15 13:36:07 1989 <<<

The N2 usage of 1/14/88

starting at 57"		finishing at 53"

>>> 'n2' problem from dar -- Tue Jan 17 02:37:42 1989 <<<

starting at 42"        finishing at 33"

>>> 'n2' problem from evan -- Tue Jan 17 08:24:05 1989 <<<

The bulk tank was filled to 116" with 2205 gal.
The BATCHtrol reading is 28023.

>>> 'n2' problem from dar -- Wed Jan 18 01:30:09 1989 <<<

starting at 114"	finishing at 108"

>>> 'n2' problem from evan -- Wed Jan 25 15:50:57 1989 <<<

BATCHtrol for thisn time is 28954.

>>> 'n2' problem from evan -- Thu Jan 26 13:54:08 1989 <<<

N2 USE 12/25/88 to 1/25/89

Bulk tank fills:		12/27/88	2583 gal
				 1/11/89	1292 gal
				 1/17/89	2205 gal
						_________
						6080 gal

MICROLAB USE:
BATCHtrol         28954 -25500			3454 gal

Dewer fills       2 smalls, 1 large		 171 gal
						_________
						3625 gal

MBE USE:
12/28	4"
 1/3	2"
 1/14	4"
 1/17	9"
 1/18	6"	total of 25" @ 26 gal/in	 650 gal

================================================================================NOTE: I have totaled the reported usages and bulk fills since I started records in October.
Mircolab dewers = 631 gal
MBE use          1846 gal
BATCHtrol        9517 gal
                _________
Total           11994 gal

Tank start 100"
Tank today  70" plus fills totaling 11863 gal
         ------
            30" @ 26 gal/in           780 gal
                                    ---------
Total from tank record              12643 gal

The accumulated error is just over 5% which is quite acceptable considering
allowance for dewer spills & evaporation and the 'nearest inch' measurement
for MBE use.

>>> 'n2' problem from mario -- Thu Feb  2 08:56:19 1989 <<<

Filled Microlab Tank #3 on Friday, January 27th.  Filled tanks #1 and
2 on Monday, January 30th.  All tanks were empty at start.  Average
drain on large storage dewar was ~1".

mario  

>>> 'n2' problem from mario -- Mon Feb  6 14:24:09 1989 <<<

Filled Microlab tanks #'s 3 & 4.  Both were empty at start.  large
dewar is now at 80".

>>> 'n2' problem from evan -- Tue Feb  7 08:02:04 1989 <<<

Bulk tank filled 1/31/89 with 2144 gal.

>>> 'n2' problem from evan -- Mon Feb 13 08:12:35 1989 <<<

There is now a readout for the differential pressure transducer from
the bulk LN tank.  It is located above the CONLOG readout in CG1.
It reads out in inches from 0 (empty) to 115 (full). I will be tweeking
the scale but it is close now.

>>> 'n2' problem from mario -- Mon Feb 13 16:52:33 1989 <<<

Filled microlab tank #4. Outside dewar level is ~40".

mario

>>> 'n2' problem from evan -- Tue Feb 14 08:35:20 1989 <<<

Bulk tank filled with 2095 gal.
BATCHtrol reading is 31234.
DPT readout scale set to 114".

>>> 'n2' problem from mario -- Thu Feb 23 14:42:41 1989 <<<

Filled tank #1. Empty at start. Main tank level 69 at start, 67 at finish.

>>> 'n2' problem from spivey -- Thu Feb 23 17:00:32 1989 <<<

Filled tank #4. Empty at start. Main tank level 67 at start, 63 at end.

>>> 'n2' problem from jwalker -- Fri Feb 24 01:13:08 1989 <<<

After a brief laps of activity, the MBE Lab will be active this weekend and
will thus be drawing nitrogen from the outside tank.  Jeff.

>>> 'n2' problem from jwalker -- Sat Feb 25 22:27:49 1989 <<<

MBE LN2 USE:  54" to 47"  from 9:00 am to 10:00 pm
			== 7" over 13 hours
		How much of this 7" was used by the microlab?

>>> 'n2' problem from evan -- Wed Mar  1 09:13:22 1989 <<<

The average daily use of the lab is 4". Since your use was during the
day when microlab use is somewhat higher, I would say that our use was
2.5".  You will be charged by Rosemary for 4.5" of use. (= 109 ccf)

>>> 'n2' problem from evan -- Wed Mar  1 09:36:07 1989 <<<

N2 USE 1/26/89 TO 2/28/89

BULK TANK FILLS:	2/14	2095 gal.
			2/28	2073 gal.
				---------
				4168 gal.

MICROLAB USE:
	Dewer fills:
		3 large @ 65	 195 gal.
		5 small @ 53	 265 gal.
 				---------
				 460 gal.

	BATCHtrol:
		32739-28954  =	3785 gal.

MBE USE:
	2/25	4.5"		 117 gal.

TOTAL USE:			----------
				4362 gal.

>>> 'n2' problem from evan -- Wed Mar  1 09:49:08 1989 <<<

N2 USE RUNNING TOTAL:
	Fills:		11863 + 4168	16031 gal.
	Correction:	100" start
			110" 2/28
			---------
			- 10" @ 26"/gal	 -260 gal.
					-----------
					15771 gal.

	Reported Use:
			11994 + 4362	16356 gal.

This shows an accumulated error of less that 4% since 9/88.

>>> 'n2' problem from mario -- Mon Mar  6 16:10:00 1989 <<<

filled microlab tank #3.  it was empty at start.

>>> 'n2' problem from mario -- Wed Mar  8 12:51:08 1989 <<<

Filled microlab tanks #3 & #2.  Both were empty at start.

mario

>>> 'n2' problem from voros -- Mon Mar 13 12:59:54 1989 <<<

There will be construction on the W side of HMB from March 27-Apr.12.
Evan, pls coordinate LN delivery with Wil's office.
Thank you.

>>> 'n2' problem from evan -- Wed Mar 15 08:15:45 1989 <<<

Bulk N2 tank filled with 2171 gal. on 3/14/89, 6:30:00.

>>> 'n2' problem from jwalker -- Wed Mar 15 20:02:02 1989 <<<

MBE use:
3-15-89		from 110" at 12:00 noon to 105" at 8:00 pm
			(5" over 8 Hrs.)

>>> 'n2' problem from jwalker -- Wed Mar 22 03:13:23 1989 <<<

MBE use:
3/21/89		from   76" at 8:00pm   to   71" at 3:00am
		(5" over 7 Hrs.)

>>> 'n2' problem from mario -- Thu Mar 23 09:28:50 1989 <<<

Filled Microlab tanks #'s 2 & 3.

>>> 'n2' problem from jwalker -- Thu Mar 23 15:56:32 1989 <<<

MBE use:
3/23/89		2"

>>> 'n2' problem from bob -- Mon Mar 27 08:50:28 1989 <<<

Hats off Evan, you seem to have reduced our N2 steady state use to a
more respectable value. 
bob

>>> 'n2' problem from jwalker -- Tue Mar 28 01:46:24 1989 <<<

MBE use:
3/26/89		95" at 2:00 pm   to   92" at 6:00 pm
		(3" over 4 hours)
3/27/89		88" at 1:00pm    to   83" at 8:00pm
		(5" over 7 hours)

We would like to continue running the MBE (I suspect 5 to 15 inch/week)
If you are certain nitrogen can not be delivered over the next two weeks,
then you should try to give us a figure on how much nitrogen we can use
over this time period and we will try to ration accordingly.

>>> 'n2' problem from evan -- Tue Mar 28 09:12:08 1989 <<<

BATCHtrol reading is 35571.  Bulk tank at 82".

>>> 'n2' problem from evan -- Tue Mar 28 14:10:32 1989 <<<

--------------------------------------------------------------------------------
N2 USAGE 2/28/89 TO 3/28/89

BULK TANK FILLS:
		3/14	2171 gal.
		3/23	1320 gal.
			---------
			3491 gal.

MICROLAB USE:
		5 Dewers @ 53 gal.	265 gal.

		BATCHtrol  35571
			   32739
		 	   ------ 
			    2832	2832 gal.
					---------
					3097 gal.

MBE USE:
	3/15	5"  over 8 hours		NOTE: I have added a correction
	3/21	5"	 7			for MBE readings taken over long
	3/23	2"				periods (>3 hours). Reported use
	3/26    3"	 4			will be reduced by 0.2"/hr. This
	3/27    5"       7			is based on 4" per 20 hour 'day'
	--------------------------		by the Microlab.
		20" over 26 hours
		20"  -  (26 X .2) = 15"
					---------
			15" @ 26 gal/in  390 gal.


TOTAL REPORTED USE:			3487 gal.

-------------------------------------------------------------------------------

RUNNING TOTALS:
    FILLS:   16031 + 3491 = 19522 gal.
           Tank 100" start
            to   82"
           -----------
                 18" @ 26 =  468 gal.
                             ---------
     TOTAL TANK USE:        19990 gal.

  REPORTED USE:	16356 + 3487 = 19843 gal.

-------------------------------------------------------------------------------

>>> 'n2' problem from mario -- Thu Mar 30 10:22:30 1989 <<<

Filled Tanks #1, 3, & 4. #'s 3 & 4 were empty.
Number 1 was half-full.

>>> 'n2' problem from jwalker -- Fri Mar 31 18:44:18 1989 <<<

MBE use:
3/30/89		7" over 9 Hours

>>> 'n2' problem from jwalker -- Sat Apr  1 11:14:34 1989 <<<

MBE use:
4-1-89		2"

>>> 'n2' problem from jwalker -- Tue Apr  4 00:02:01 1989 <<<

MBE use:
4/3/89		38" noon   to   29" midnight
		(9" over 12 hours)

We also purged our phase seperator with N2 gas over the weekend and it is
possible that this was the cause large drop in the n2 tank level during
this period.  We noticed it dropped close to 20" over the weekend.
Jeff

>>> 'n2' problem from jwalker -- Sun Apr  9 04:15:59 1989 <<<

MBE use:
4/8/89		92" at 8:00pm   to   86" at 4:00am
		(6" over 8 hrs)

>>> 'n2' problem from evan -- Fri Apr 14 13:03:12 1989 <<<

A bulk n2 delivery is scheduled for Tuesday, April 18th.  This will
be the first attempt to have the delivery truck/trailer back in along
the east side of Hearst Mining.  Bob and I met with the parking services
and there will be no parking along this route.  The n2 level is high enough
to allow the lab to operate through Friday should a problem arise on the
first delivery attempt.
I feel it is an unfortunate sign of the organization of the project that
bob and I learned of the change in schedule of construction on a Friday
before the Monday starting date.

>>> 'n2' problem from jwalker -- Mon Apr 17 13:59:53 1989 <<<

MBE use:
4/15/89		5" over 6.5 Hrs

>>> 'n2' problem from evan -- Tue Apr 25 13:58:31 1989 <<<

BATCHtrol at 38467...tank at 73".

>>> 'n2' problem from evan -- Fri Apr 28 16:05:21 1989 <<<

LN USAGE 3/28/89 to 4/26/89

BULK TANK FILLS:
	4/4			2313 gal
	4/18			2012 gal
				---------
				4325 gal

MICROLAB USE:
	4.5 small dewers @ 52	 238.5 gal
	2  large dewers @ 65	 130   gal

  BATCHtrol  38467
	   - 35571
            -------
             2896		2896 gal
				----------
   				3264.5 gal

MBE USE:
	3/30	7"  over 9 hrs
	4/1	2"
	4/1-2   5" purge est.
	4/3     9"  over 12 hrs
	4/8     6"        8
        4/17    5"       6.5
              -----------------
               34" over 35.5 hrs
               34" - (35.5 X 0.2)
	       34" - 7.1 = 26.9"
                            @ 26 gal/" = 700 gal

TOTAL USE:   3964.5 gal

>>> 'n2' problem from evan -- Fri Apr 28 16:27:15 1989 <<<

RUNNING TOTALS ON N2 USE:

FILLS: 19522 gal
        4325
      -----------
       23847 gal.
100"
-73"
----
 27" @ 26
        702 gal.
----------------
Total  24549 gal.

USE: 19843
      3965
----------
Total: 23808 gal.

The discrepency is probibly due to running the lab on N2 bypass when the
air compressors were down.  Although all the n2 goes through the BATCHtrol,
it may have exceeded the upper range of the mass flow meter. I would be
hard to check without increasing the bulk tank pressure to >100 psi and
putting the lab into bypass mode (which I do not want to do).  If use and
fill totals agree next month, I will assume this to be the source of the
discrepency.

>>> 'n2' problem from jwalker -- Fri May  5 00:07:37 1989 <<<

MBE use:
5/4/89		6" over 10 hours.

>>> 'n2' problem from mario -- Tue May  9 09:23:54 1989 <<<

Have filled two orange dewars and the large one.

mario

>>> 'n2' problem from jwalker -- Wed May 10 21:52:32 1989 <<<

MBE use:
5/10/89		5" over 7 Hrs


>>> 'n2' problem from evan -- Tue May 30 17:04:28 1989 <<<

 ___________________________________________________________________________ 
|                     *****MICROLAB NITROGEN REPORT*****                    |
|                  FOR PERIOD FROM:  4-26-89  TO:  5-30-89                  |
|===========================================================================|
|    BULK TANK FILLS:   DATE      5-2      5-16                             |
|                        GAL     1986      2137                             |
|                                                   TOTAL FILLS:  4123 GAL  |
|---------------------------------------------------------------------------|
|    MICROLAB USAGE:                                                        |
|       Batchtrol Ending:  41869 -  Start:  38467 =       3402 GAL          |
|                                                                           |
|       2 Small dewers @ 56 Gal = 112 Gal                                   |
|       1 Large dewers @ 65 Gal =  65 Gal                                   |
|                                     Total dewer fills =  177 GAL          |
|---------------------------------------------------------------------------|
|    MBE USAGE:                                                             |
|       Date       5-4      5-10                                            |
|       Inches     6.0       5.0                                            |
|       Hours       10         7                                            |
|     Total of 11.0 inches over 17 hours.                                   |
|     Use reduced by 0.2 in/hr = 7.6 inches X 26 gal/in =  198 GAL          |
|---------------------------------------------------------------------------|
|                                            TOTAL NITROGEN USE:  3777 GAL  |
|___________________________________________________________________________|

>>> 'n2' problem from jwalker -- Wed May 31 03:41:34 1989 <<<

MBE use:
5/24/89		6" over 9 hours
5/30/89		8" over 12 hours

>>> 'n2' problem from jules -- Wed May 31 14:54:22 1989 <<<

Filled tank #3. Empty at start. Main tank level 113 at start, 112 at end.

>>> 'n2' problem from jwalker -- Thu Jun  1 19:37:28 1989 <<<

MBE use:
6/1/89		7" over 12 hours

>>> 'n2' problem from jwalker -- Fri Jun  2 22:31:55 1989 <<<

MBE use:
6/2/89		9" over 13.5 hours

>>> 'n2' problem from jwalker -- Sun Jun  4 17:55:26 1989 <<<

MBE use:
6/4/89 		4" over 5 Hrs.

>>> 'n2' problem from jwalker -- Sun Jun 11 15:50:46 1989 <<<

MBE use:
6/6/89		6.5" over 8.5 Hrs.
6/9/89		6"   over 8.5 Hrs.

>>> 'n2' problem from evan -- Mon Jun 12 08:00:33 1989 <<<

A delivery of n2 has been scheduled for Tuesday morning.  The upper 
Mining Circle parking areas will be marked "no parking" from 7-10.

>>> 'n2' problem from jwalker -- Mon Jun 12 08:31:00 1989 <<<

The nitrogen tank is down to 30" and we would like to run the MBE heavily
this week.  Can you tell me when nitrogen is scheduled to be delivered.
Jeff.

>>> 'n2' problem from voros -- Tue Jun 13 16:28:39 1989 <<<

Mr. Chiladakis (2-1943) from the Coll. of Chemistry called and 
informed me that they are negotiating a new LN contract with 
Liquid Carbonics which will probably come in at a lower price 
than last year's.
To be able to have maximum negotiating flexibility they would like us
to consider buying our tank, which we are currently leasing from LC
($450/Mo.) Chemistry bought theirs about 30 yrs ago.

Hal Brown from Purchasing (2-2985) has been negotiating a buy-out
plan for us, approx. $620/Mo for 5 yrs. I agreed to go with this plan
and hope that the increase in the monthly fee will be offset by the
reduced price in liquid nitrogen.

Katalin

>>> 'n2' problem from evan -- Wed Jun 14 13:52:22 1989 <<<

The bulk tank was filled Tuesday morning with 2436 gal.  Level to 114 in.

>>> 'n2' problem from jwalker -- Fri Jun 16 13:55:43 1989 <<<

MBE use:
6/6/89		6.5"	8.5 Hrs
6/9/89		6" 	8.5 Hrs
6/12/89		6"	3.5 Hrs		(did you fill tanks?)
6/13/89		11"	26  Hrs
6/15/89		10"	16  Hrs

FYI: Changes in consumption Vs. time is related to how hot we have the
MBE furnaces during the growths.  Our system is completely vacuum insulated
and thus teh boil off can be related to the amount of power which we poor
into the MBE furnaces and substrate heater.

Jeff

>>> 'n2' problem from bob -- Mon Jun 19 08:41:23 1989 <<<

The filters in the new lab's Gelman blow off guns have been 
changed and new ones have been installed. The filter type 
is Gelman 4218.  There are 36 blow off guns in the new lab.
The guns in the old lab use a different filter and do not
need changing at this time.
.

>>> 'n2' problem from jwalker -- Thu Jun 22 15:34:23 1989 <<<

MBE use:
6/19/89		4" over 5 Hrs.      5:00pm to 10:30pm	
6/20/89		9" over 14.5 Hrs	11:30am to 2:00am
6/21/89		4" over 8 Hrs.		3:00pm to 11:00pm


Is nitrogen scheduled to be delivered soon?

>>> 'n2' problem from jwalker -- Fri Jun 23 08:53:06 1989 <<<

MBE use:
We plan on using 5-10 in. of nitrogen today

>>> 'n2' problem from evan -- Mon Jun 26 08:47:11 1989 <<<

The bulk tank was filled this a.m. with 2388 gal.  The level was down to
22 inches. It is now 114".

>>> 'n2' problem from jwalker -- Wed Jul  5 11:02:18 1989 <<<

The bulk tank is down to 30".  I plan on growing today.

>>> 'n2' problem from jwalker -- Wed Jul  5 11:27:13 1989 <<<

mbe use:
6/22/89		4" over 8 Hrs		3:00pm to 11:00pm
6/23/89     	11" over 11 Hrs.	9:00am to 8:00pm
6/26/89		1" over 3.5 Hrs.	7:00pm to 10:30pm
6/27/89		38" over 75 Hrs.	4:30pm 6/27 to 7:30pm 6/30
7/1/89		6" over 8 Hrs.		10:00am to 6:00 pm
7/2/89		5" over 6.5 Hrs.	12:00noon to 6:30pm 
7/3/89		8" over 10 Hrs.		1:00pm to 11:00pm
7/4/89		5" over 6.5 Hrs.	12:00pm to 6:30pm

>>> 'n2' problem from evan -- Wed Jul  5 16:03:25 1989 <<<

 ___________________________________________________________________________ 
|                     *****MICROLAB NITROGEN REPORT*****                    |
|                  FOR PERIOD FROM:  5-30-89  TO:  6-21-89                  |
|===========================================================================|
|    BULK TANK FILLS:   DATE     5/31      6/13                             |
|                        GAL     1960      2436                             |
|                                                   TOTAL FILLS:  4396 GAL  |
|---------------------------------------------------------------------------|
|    MICROLAB USAGE:                                                        |
|       Batchtrol Ending:  43839 -  Start:  41869 =       1970 GAL          |
|                                                                           |
|       4 Small dewers @ 53 Gal = 212 Gal                                   |
|       1 Large dewers @ 65 Gal =  65 Gal                                   |
|                                     Total dewer fills =  277 GAL          |
|---------------------------------------------------------------------------|
|    MBE USAGE:   Date   Inches   Hours        Date   Inches   Hours        |
|                 5/24      6.0       9        5/30      8.0      12        |
|                  6/1      7.0      12         6/2      9.0      13        |
|                  6/4      4.0       5         6/6      6.5       8        |
|                  6/9      6.0       8        6/12      6.0       3        |
|                 6/13     11.0      26        6/15     10.0      16        |
|                 6/19      4.0       5        6/20      9.0      14        |
|                 6/21      4.0       8                                     |
|     Total of  90.5 inches over 139 hours.                                 |
|     Use reduced by 0.2 in/hr =  62.7 inches X 26 gal/in = 1630 GAL        |
|---------------------------------------------------------------------------|
|                                            TOTAL NITROGEN USE:  3877 GAL  |
|___________________________________________________________________________|

Sorry this is late but program had to be modified to accept 13 MBE uses.
.

>>> 'n2' problem from evan -- Thu Jul  6 07:57:10 1989 <<<

Bulk delivery is scheduled for this morning.

>>> 'n2' problem from evan -- Thu Jul  6 13:07:49 1989 <<<

The bulk tank has been filled with 2492 gal.

>>> 'n2' problem from jwalker -- Wed Jul 12 01:07:34 1989 <<<

mbe use
7/5/89		4" over 4.5 Hrs		10:00pm to 2:30am
7/7/89		3" over 6 Hrs		8:30am to 4:30pm
7/9/89		4" over 6 Hrs		12:00pm to 6:00pm
7/10/89		10" over 10 Hrs 	1:00pm to 11:00pm 
  		this last entry shows much more nitrogen than we could have
  		used whereas the second entry shows less than we could have
		used.  The mechanical gauge has seems a little random
		lately -- have you noticed whether the new digital gauge
		is any more consistent?  Is the electronic gauge hooked
		up to the computer system yet so that we can access it 
		from argon?

					Jeff

>>> 'n2' problem from evan -- Fri Jul 14 17:25:27 1989 <<<

A bulk delivery is scheduled for Monday July 17th.

>>> 'n2' problem from evan -- Mon Jul 17 08:22:45 1989 <<<

A bulk LN delivery has been made. 2040 gal. were delivered bringing the level
up from 37 to 114 inches.

>>> 'n2' problem from evan -- Tue Jul 25 09:08:59 1989 <<<

A bulk delivery is scheduled for Thursday morning July 27.

>>> 'n2' problem from bob -- Thu Jul 27 10:27:15 1989 <<<

The back of the building has been checked for cars that might 
present a problem for our mid-morning N2 delivery. Parking service
removed one illegaly parked car.

The MBE is holding any growths until after our delivery. Delivery is
pending.

>>> 'n2' problem from bob -- Thu Jul 27 11:28:55 1989 <<<

The Microlab received a delivery of N2 this morning. The tank is full.

>>> 'n2' problem from jwalker -- Wed Aug  2 17:02:10 1989 <<<

mbe use:
7-10-89		10" over 10 Hrs		1:00pm to 11:00pm
					(were microlab dewars filled here?)
7-11-89  	15" over 27 Hrs		12:00noon to 3pm
7-14-89		8" over 9 Hrs		12:30pm to 9:30pm
					(microlab dewars were filled here)
7-17-89  	33" over 64 hrs		8:30pm 7/17 to 1pm7/20
7-22-89		2" over 3 hrs		7:30am to 10:30am
7/23/89		7" over 10.5 Hrs	8:00pm to 6:30am
7/26/89		about 35" over 45 hrs	2:00am7/26 to 11:00pm7/27
					(outside tank was filled in the middle
					so exact numbers are no known)
8/2/89		4" over 4.5 Hrs		12:30pm to 5:00pm

note: Our nitrogen use will drop considerably for the next two months (prelims).



					Jeff

>>> 'n2' problem from evan -- Tue Aug 15 08:19:15 1989 <<<

The date and container number of all lab dewer fills should be reported to
equipment problems (as a fix) in order to complete our usage reports.

>>> 'n2' problem from evan -- Wed Aug 30 10:31:20 1989 <<<

 ___________________________________________________________________________ 
|                     *****MICROLAB NITROGEN REPORT*****                    |
|                  FOR PERIOD FROM:           TO:  8-28-89                  |
|===========================================================================|
|    BULK TANK FILLS:   DATE      8-8      8-25                             |
|                        GAL     1854      2351                             |
|                                                   TOTAL FILLS:  4205 GAL  |
|---------------------------------------------------------------------------|
|    MICROLAB USAGE:                                                        |
|       Batchtrol Ending:  50553 -  Start:  47052 =       3501 GAL          |
|                                                                           |
|       3 Small dewers @ 53 Gal = 159 Gal                                   |
|       1 Large dewers @ 65 Gal =  65 Gal                                   |
|                                     Total dewer fills =  224 GAL          |
|---------------------------------------------------------------------------|
|    MBE USAGE:   Date   Inches   Hours        Date   Inches   Hours        |
|                  8-2      4.0       4                                     |
|     Total of   4.0 inches over   4 hours.                                 |
|     Use reduced by 0.2 in/hr =   3.2 inches X 26 gal/in =   83 GAL        |
|---------------------------------------------------------------------------|
|                                            TOTAL NITROGEN USE:  3808 GAL  |
|___________________________________________________________________________|

>>> 'n2' problem from jules -- Fri Sep 15 14:13:31 1989 <<<

Filled four LN tanks for MBE lab. Main tank level 78 at start, 71 at end.

>>> 'n2' problem from evan -- Mon Sep 18 09:48:35 1989 <<<

The water main construction project around the north and east sides of Hearst
Mining Building is scheduled to start on Thursday, Sept 21.  The LN tank will
be topped off late Tuesday or early Wednesday morning.  The progress of this
work will need to be closly monitored as the tanks reaches refill level.  This
type of project always goes on longer than planned.  The campus contact is
Sonja Biorn-Hansen at 2-3693 or 2-8367.  

>>> 'n2' problem from jwalker -- Fri Sep 22 14:36:36 1989 <<<

Prelims are over and I expect the MBE lab will resume using nitrogen at 
moderate levels.
Jeff

>>> 'n2' problem from jwalker -- Thu Sep 28 11:35:16 1989 <<<

I plan on trying to grow two samples this week (total of about 12" N2)
Jeff.

>>> 'n2' problem from jwalker -- Fri Sep 29 17:58:46 1989 <<<

MBE ln2 use:
9/29		5.5" over 7 hours

>>> 'n2' problem from jwalker -- Wed Oct 11 20:38:26 1989 <<<

MBE use:
8/2/89   	4" over 5 Hrs.   (sorry its late)

9/29/89		5.5" over 7 Hrs.
10/8/89		2" over 1 Hr.
10/10/89	8" over 13 Hrs.

>>> 'n2' problem from bob -- Fri Oct 13 15:29:23 1989 <<<

A dip in N2 pressure is attributed to the N2 supplying
the lab air supply for a short time while the building
compressor filled the air lines located on the western side
of Cory Hall. This was to complete a scheduled shutdown.

N2 appears up and running well. A new filter assembly will
be installed to help support higher N2 use. This should be
completed on Monday, Oct. 16th.

>>> 'n2' problem from bob -- Thu Oct 19 14:59:18 1989 <<<

The 6 pleat house n2 filter has been changed to a 12 pleat design.
This will reduce the pressure drops at high flow rates. tyaln10, eaton
and the spindryers should present few problems now. GL-4 should be
ahppier!

>>> 'n2' problem from hadley -- Mon Oct 23 16:18:09 1989 <<<

MBE use.
10/20/89   5" over 7 hours
10/22/89  29" over 50 hours

>>> 'n2' problem from jwalker -- Wed Oct 25 04:09:03 1989 <<<

mbe use:
10/24/89	9" over 15.5 Hrs. 

>>> 'n2' problem from evan -- Fri Oct 27 08:16:17 1989 <<<

The bulk tank will be filled early Monday a.m.   The level is at 36" at this
time.  Since the microlab will use about 15" by then, the level will be very
low at refill time.  
The MBE lab will have to hold off on any long runs over this weekend.

>>> 'n2' problem from jwalker -- Sat Oct 28 02:28:20 1989 <<<

mbe use:
10/27	4" over 4.5 Hrs.
(we will not use any more n2 until the tank is filled)

>>> 'n2' problem from evan -- Mon Nov 20 09:59:36 1989 <<<

The delivery due today was missed.  I is now scheduled for late tonight.  It
seems that every customer is trying to get filled before the long weekend.
Please limit your use until the tank has been refilled.

>>> 'n2' problem from jwalker -- Mon Nov 20 16:02:15 1989 <<<

11/15	6" over 8.5 hrss
11/17	23.5" over 35 hours

>>> 'n2' problem from jwalker -- Wed Nov 22 03:53:37 1989 <<<

mbe use:
11/21		5.5" over 7.5 hrs

>>> 'n2' problem from jwalker -- Mon Nov 27 10:48:32 1989 <<<

MBE use:
We started a growth Sunday 11/26 and will finish tomorrow morning
  Tank was at 86" when we started, and we plan on using a total of about 25"
Jeff

>>> 'n2' problem from jwalker -- Tue Nov 28 01:42:49 1989 <<<

mbe use:
11/26/89	21" over 34 hours

>>> 'n2' problem from evan -- Tue Nov 28 14:03:27 1989 <<<

MBE reported usage for period from 10/27 to 11/26:

	Date	Inches	Period
	10/27	4	4.5 hours
	11/15	6	8.5
	11/17	23.5	35
	11/21	5.5	7.5
	11/26	21	34
		-------------------
		60" over 89.5 hrs.
					89.5 hrs X 0.2 = 17.9 reduction
	     - 17.9"
		-------
		42.1"  X  26 gal/in = 1094.6 gal X 0.93 ccf/gal = 1018 ccf.

>>> 'n2' problem from harshman -- Fri Dec  8 11:50:34 1989 <<<

We plan to use the MBE (n2) one day this weekend.
(please note this is an advance warning, as requested
 by evan)

>>> 'n2' problem from harshman -- Sun Dec 10 23:32:00 1989 <<<

The MBE lab used n2 for 13.5 hours on sunday, during which
time the tank dropped 8.4 inches.

>>> 'n2' problem from harshman -- Fri Dec 15 10:14:26 1989 <<<

This is an advance notice that the MBE lab plans to run
saturday 12/16 (tomorrow). Thanks.

>>> 'n2' problem from harshman -- Mon Dec 18 11:47:44 1989 <<<

The MBE lab ran on Saturday, 12/16, from 9:30am to 2:45pm
during which time the n2 level dropped form 91.3" to 86.7";
(4.6" drop over 5.25 hours).


Also, in advance notice, we also plan to run today and on
wednesday.

Thanks.

>>> 'n2' problem from harshman -- Wed Dec 20 17:52:40 1989 <<<

The MBE lab ran today from 9:15am to 5:40pm (8.5 hrs) during
which time the n2 level dropped 6.25", from 64.75" to 58.5".

We would like to run again either Friday or Saturday.

Thanks.

>>> 'n2' problem from jwalker -- Thu Dec 21 07:41:01 1989 <<<

I noticed that the external N2 tank is extremely iced up.  You may want
to check on it.  Also, there is a valve marked "vapor shut off" which 
is leaking. I'm not sure of my valve terminology, but the nut which tightens
down around the valve shaft is very loose.

Jeff

>>> 'n2' problem from evan -- Thu Dec 21 16:50:34 1989 <<<

LN tank has been de-iced.  

>>> 'n2' problem from harshman -- Sun Dec 31 16:48:15 1989 <<<

The MBE lab ran from 9:30am to 11:30pm on 12/28, and the n2
tank level dropped 8", from 84" to 76".

We also ran on 12/31 for 4 hours, during which time the tank
level dropped 4", from 64" to 60".

I had to read the above tank levels manually from the gauge
outside because the wand sensor monitor does not seem to
be working.

Thanks.

>>> 'n2' problem from evan -- Wed Jan  3 08:57:12 1990 <<<

delivery scheduled for tonight

>>> 'n2' problem from jwalker -- Tue Jan  9 19:29:56 1990 <<<

MBE N2 use:
1/9	4" over 4 Hrs

>>> 'n2' problem from bob -- Fri Jan 12 15:35:25 1990 <<<

A quick calculation shows we will consume about 50% more N2
when we use the N2 as a backup for the air in the lab. We will
be in this mode during the power shutdown Jan 20th for 8
hrs.  It looks like this won't be any problem.

>>> 'n2' problem from harshman -- Tue Jan 16 23:33:53 1990 <<<

The MBE lab ran from 6:00pm until 11:00pm today, and the n2
tank level dropped 5" (57" to 52").  Thanks.

>>> 'n2' problem from bob -- Thu Jan 18 15:17:57 1990 <<<

Two LN cylinders were filled for the MIcrolab after lunch
today.
ML tank#1 and ML tank#4.
The heatexchanger was also deiced.

>>> 'n2' problem from jwalker -- Fri Jan 19 06:52:36 1990 <<<

I plan on running the MBE today.  The tank is now at 37".

Jeff

>>> 'n2' problem from jwalker -- Tue Jan 23 04:15:37 1990 <<<

mbe use
1/22/89
		11" over 19 hours

>>> 'n2' problem from jwalker -- Thu Jan 25 14:53:45 1990 <<<

mbe use:
1/24/90		6" over 8 Hrs

>>> 'n2' problem from harshman -- Sun Jan 28 01:12:21 1990 <<<

The MBE lab used n2 today from 10:00am to 1:00am; the tank level
dropped 8.7", from 67.4" to 58.7", during this time. 
Thanks.

>>> 'n2' problem from jwalker -- Mon Jan 29 09:16:06 1990 <<<

I plan on growing today.
Jeff

>>> 'n2' problem from tom -- Wed Jan 31 16:05:38 1990 <<<

Filled LN tank #3 and put it back on the cssem.

>>> 'n2' problem from pnelson -- Thu Feb  1 09:27:14 1990 <<<

Filled tank 2 with ln

>>> 'n2' problem from bob -- Fri Feb  2 07:16:14 1990 <<<

The LN tank was filled this morning and is at 110 inches.

>>> 'n2' problem from harshman -- Sat Feb  3 10:25:48 1990 <<<

The MBE ran on 2/2 from 4:00pm until 12:00am; the n2 level
dropped 4.4", from 108" to 103.6", during this time.
Thanks.

>>> 'n2' problem from jwalker -- Mon Feb  5 08:50:23 1990 <<<

We are running....
Started Sunday pm @96.5"

>>> 'n2' problem from harshman -- Wed Feb  7 20:31:06 1990 <<<

The MBE ran from 5:30pm on 2/4 until 10:00pm on 2/5 (28.5hrs),
during which time the tank level dropped 16.5", from 96.5"
to 80".

>>> 'n2' problem from harshman -- Wed Feb  7 23:25:31 1990 <<<

The MBE ran for 3 hours (8:20pm to 11:20pm) today, and the tank
level dropped 2.7", from 71.1" to 68.4", during this time.

Also, we plan to grow sometime during the coming weekend.
Thanks.

>>> 'n2' problem from harshman -- Sat Feb 10 22:43:40 1990 <<<

The MBE ran 12.5 hrs today (10:10am to 10:40pm); the n2 level 
dropped 7.7", from 55.2" to 47.5", during this time.
Thanks.

>>> 'n2' problem from bob -- Fri Feb 16 10:36:32 1990 <<<

Cylinder #3 has been filled and installed on the cssem.

>>> 'n2' problem from evan -- Fri Feb 23 14:55:51 1990 <<<

Liquid Carbonics has taken over a plant in Vacaville which will be our source
for LN.  The new number for scheduling deliveries is: 1-800-544-7811.  The
new dispatcher is Mike.  

>>> 'n2' problem from jwalker -- Sat Feb 24 21:25:30 1990 <<<

2/24	7.5" over 10 Hrs.

External tank now at 36"

>>> 'n2' problem from evan -- Mon Feb 26 08:03:21 1990 <<<

We are now working with a new dispatcher and delivery location (and new driver?)and were unable to get a Sunday night delivery.  The delivery is scheduled for
Monday night.  I was not aware that MBE was going to run over the weekend and
so this mornings level is lower than I had predicted.  We should be fine after
the delivery tonight.

>>> 'n2' problem from harshman -- Tue Feb 27 21:14:08 1990 <<<

The MBE ran today from 1:30pm to 6:30pm, and the tank level dropped
to 105".

>>> 'n2' problem from jwalker -- Wed Feb 28 16:09:14 1990 <<<

2/28	3.5" in 6 Hrs

>>> 'n2' problem from phillip -- Thu Mar  1 12:53:45 1990 <<<

the dewar that feeds the cssem has been filled.
pnelson

>>> 'n2' problem from jwalker -- Sat Mar  3 01:58:11 1990 <<<

3/2	12" over 17 Hrs

>>> 'n2' problem from jwalker -- Sat Mar  3 08:29:13 1990 <<<

3/3	4.5" over 6.5 hrs

>>> 'n2' problem from harshman -- Sun Mar  4 23:48:46 1990 <<<

The MBE lab used n2 from 8:40pm (n2 level 66") until 10:15pm (62.9")
today.

>>> 'n2' problem from phillip -- Mon Mar  5 10:44:16 1990 <<<

ln tank number 1 has been filled and is currently in the gas storage 
room.
pnelson

>>> 'n2' problem from harshman -- Tue Mar  6 09:27:55 1990 <<<

The MBE ran yesterday from 11:40am (n2 level=58.4") until 12:40am
(13 hours).

>>> 'n2' problem from phillip -- Tue Mar  6 12:42:01 1990 <<<

Tank#4 (the silver tank) has been replenished with
LN2. 
pnelson

>>> 'n2' problem from jwalker -- Tue Mar  6 13:58:04 1990 <<<

We would like to run the MBE over the weekend so it would be
convenient for us if nitrogen is delivered by friday.  Also, I plan
on growing tomorrow and we would like to run on Thursday as well.

Also, please add Pat Harshman to your n2 mailing list

Jeff

>>> 'n2' problem from jwalker -- Thu Mar  8 11:44:08 1990 <<<

3/7/90		8.5" over 9 Hrs.

>>> 'n2' problem from bob -- Fri Mar  9 20:28:31 1990 <<<

We have received our n2 delivery. The tank is now full and ready for use
by both the Microlab and MBE.

>>> 'n2' problem from phillip -- Mon Mar 19 11:03:37 1990 <<<


The rental dewar in the 143lab has been replenished
with LN2.

>>> 'n2' problem from evan -- Tue Mar 20 10:57:38 1990 <<<

LN delivery scheduled for Thursday night, 3/22/90.

>>> 'n2' problem from pnelson -- Thu Mar 22 12:51:56 1990 <<<

ln2 tank number 3 has been filled.
pnelson

>>> 'n2' problem from pnelson -- Mon Mar 26 08:17:41 1990 <<<

Ln2 tanks 1 & 4 have been filled.
pnelson

>>> 'n2' problem from bob -- Tue Mar 27 10:59:00 1990 <<<

A 160 litre liquid dewar was filled today by jef@argon. He is in the 
cryo group, acct pending and will be recharged for this fill.

>>> 'n2' problem from evan -- Wed Mar 28 12:41:29 1990 <<<

The charge for filling a 160L dewer:
	160L = 42.3 gal
              + 8.5 gal for spill and flash loss
              ----------
               50.8 gal X 0.93 CCF/gal = 47.24 CCF @ $0.21 = $9.92/dewer

>>> 'n2' problem from evan -- Wed Mar 28 13:04:46 1990 <<<

MBE LN usage for 2/27/90 thru 3/27/90:

49.9" over 58.5 hrs. = 38.2" X 26 gal/" = 993.2 gal X .93 CCF/gal = 924 CCF.

>>> 'n2' problem from jwalker -- Mon Apr  2 20:32:30 1990 <<<

MBE use:
4/2/90		7" over 6 Hrs.

>>> 'n2' problem from harshman -- Sun Apr  8 23:28:45 1990 <<<

MBE ran 4/8: 6" drop (56" to 50") over 8 hrs.

>>> 'n2' fix from pnelson -- Mon Apr  9 10:32:31 1990 <<<


ln2 tank number 3 has been filled, this is the dewar located in CN1.
pnelson

>>> 'n2' fix from pnelson -- Thu Apr 12 12:47:14 1990 <<<

ln2 dewar number 1 has been filled and is currently in the old lab.
pnelson

>>> 'n2' fix from evan -- Fri Apr 13 12:39:04 1990 <<<

A 160liter LN dewer was filled for Van Duzer's project.

>>> 'n2' fix from pnelson -- Wed Apr 18 09:55:47 1990 <<<

The ln2 dewar in the EE 143 lab has been filled.
pnelson

>>> 'n2' fix from pnelson -- Mon Apr 23 11:20:07 1990 <<<

ln2 dewars 1,3 & 4 have been filled and are back in their appropriate places.
pnelson

>>> 'n2' fix from pnelson -- Tue Apr 24 13:12:31 1990 <<<

ln2 dewar number 2 has been filled and is in the gas storage room.
pnelson

>>> 'n2' fix from evan -- Mon Apr 30 10:49:29 1990 <<<

MBE n2 usage for 3/38/90 thru 4/30/90

6" over 8hr = 4.4" X 26gal/" = 114.4 gal X .93 CCF/gal = 106.4 CCF

>>> 'n2' fix from pnelson -- Wed May  2 11:57:31 1990 <<<

ln2 dewar number 3 has been filled and returned to AN2d.
pnelson

>>> 'n2' fix from pnelson -- Mon May  7 11:38:19 1990 <<<

ln2 dewar number 4 has been filled and is currently in the gas storage room.
pnelson

>>> 'n2' problem from jwalker -- Tue May  8 22:39:26 1990 <<<

I noticed a possible problem with the pressure relief valve which follows
the main outside valve that controls the MBE liquid N2 line.  Since we
now have a new shut-off valve on this line inside the MBE lab, we have
been keeping this outside valve open all the time (the last month or so).
Tonight, about an hour or so after the external tank was filled, the
outside pressure relief valve on our line was releasing considerable
amounts of liquid n2 into the parking lot.  External tank pressure is just 
over 120 psi now and everything is stabilized, but we probably lost
several inches of liquid (5 in.?).  Is this release of pressure normal after
a fill, and is it just a matter of our valve popping before the
main pressure relief valve on the tank, or is this a problem?  It 
seems to me that the problem with our valve going first it would dump
liquid into the parking lot, whereas the main pressure relief valve
presumably dumps gas into the parking lot. 

If this is a problem and it is difficult to fix, we could probably be
talked into simply keeping the outside valve closed when we are not
running. 

Jeff

>>> 'n2' problem from pnelson -- Wed May  9 11:11:55 1990 <<<

ln2 dewar number 3 has been filled and is currently in CN1.

pnelson

>>> 'n2' fix from pnelson -- Fri May 11 11:37:36 1990 <<<

ln2 dewar number 2 has been filled and is currently in the gas storage rm.